
Commercial Solar Case Studies.
All the latest commercial solar projects carried out by Activ8 Solar Energies across the UK & Ireland
Commercial Solar
Case Studies.
Feel free to explore the renewable energy and solar PV projects we’ve completed for past clients, helping them save thousands on their energy bills while reducing the size of their carbon footprint, and assisting them in meeting their green targets.
Our portfolio encompasses a number of large installations across a range of sectors, including agriculture, retail, industrial and manufacturing.
Liffey Meats
Ballyjamesduff, Co. Cavan

System Size |
4.4 MWp

Number of Panels |
6,640

Installation Time |
23 Weeks
QK Marston
Marston, United Kingdom

System Size |
3.3 MWp

Number of Panels |
5,772

Installation Time |
18 weeks
John Lennon Airport
Liverpool, United Kingdom

System Size |
3 MWp

Number of Panels |
4,312

Installation Time |
26 weeks
Boohoo PLC
Burnley, Lancashire, UK

System Size |
2.7 MWp

Number of Panels |
5 933

Installation Time |
14 weeks
Gyproc Ireland (Saint-Gobain)
Kingscourt, Co. Cavan

System Size |
2.5 MWp

Number of Panels |
3,556

Installation Time |
24 weeks
QK Cold Stores
Naas, Co. Kildare

System Size |
2.3 MWp

Number of Panels |
4,021

Installation Time |
6 Weeks
Computacenter
Hatfield, Hertfordshire, UK

System Size |
2009 kWp

Number of Panels |
6 379

Installation Time |
14 Weeks
Glenpatrick Water
Clonmel, Co. Tipperary

System Size |
1.6 MWp

Number of Panels |
2869

Installation Time |
8 Weeks
Dawn Pork & Bacon
Grannagh, Co. Waterford

System Size |
1.2 MWp

Number of Panels |
2,959

Installation Time |
16 Days
Crow Wood Hotel & Spa
Burnley, Lancashire, UK

System Size |
1,127kWp

Number of Panels |
2 254

Installation Time |
12 Weeks
