Commercial Solar Case Studies.
All the latest commercial solar projects carried out by Activ8 Solar Energies across Ireland
Commercial Solar
Case Studies.
Feel free to explore the renewable energy and solar PV projects we’ve completed for past clients, helping them save thousands on their energy bills while reducing the size of their carbon footprint, and assisting them in meeting their green targets.
Our portfolio encompasses a number of large installations across a range of sectors, including agriculture, retail, industrial and manufacturing.
Coach House
Metcalf Drive, Accrington, UK
System Size |
952 kWp
Number of Panels |
3 022
Installation Time |
6 Weeks
Musgrave Kilcock
Kilcock, Co. Meath
System Size |
909 kWp
Number of Panels |
1,800
Installation Time |
12 Weeks
Board24
Ribbleton, Preston, UK
System Size |
795.8 kWp
Number of Panels |
1 730
Installation Time |
10 Weeks
Irish Dog Foods
Naas, Co. Kildare
System Size |
787 kWp
Number of Panels |
1,368
Installation Time |
5 Weeks
Tayto Snacks
Ashbourne, Co Meath
System Size |
772 kWp
Number of Panels |
1,734
Installation Time |
7 weeks
Bowker Motor Group
System Size |
732.06 kWp
Number of Panels |
1 494
Installation Time |
8 Weeks
Port of Tyne
Tyne Dock, South Shields, UK
System Size |
690 kWp
Number of Panels |
1 380
Installation Time |
8 Weeks
Rednut Limited
Gowran, Co. Kilkenny
System Size |
678 KWp
Number of Panels |
1,170
Installation Time |
4 weeks
Kuehne + Nagel
Swords, Co. Dublin
System Size |
600 kWp
Number of Panels |
1,600
Installation Time |
38 Days
Renishaw
Swords, Co. Dublin
System Size |
554 kWp
Number of Panels |
1,420
Installation Time |
6 Weeks