
Commercial Solar Case Studies.
All the latest commercial solar projects carried out by Activ8 Solar Energies across the UK & Ireland
Commercial Solar
Case Studies.
Feel free to explore the renewable energy and solar PV projects we’ve completed for past clients, helping them save thousands on their energy bills while reducing the size of their carbon footprint, and assisting them in meeting their green targets.
Our portfolio encompasses a number of large installations across a range of sectors, including agriculture, retail, industrial and manufacturing.
Coach House
Metcalf Drive, Accrington, UK

System Size |
952 kWp

Number of Panels |
3 022

Installation Time |
6 Weeks
Musgrave Kilcock
Kilcock, Co. Meath

System Size |
909 kWp

Number of Panels |
1,800

Installation Time |
12 Weeks
Board24
Ribbleton, Preston, UK

System Size |
795.8 kWp

Number of Panels |
1 730

Installation Time |
10 Weeks
Irish Dog Foods
Naas, Co. Kildare

System Size |
787 kWp

Number of Panels |
1,368

Installation Time |
5 Weeks
Tayto Snacks
Ashbourne, Co Meath

System Size |
772 kWp

Number of Panels |
1,734

Installation Time |
7 weeks
Bowker Motor Group

System Size |
732.06 kWp

Number of Panels |
1 494

Installation Time |
8 Weeks
Port of Tyne
Tyne Dock, South Shields, UK

System Size |
690 kWp

Number of Panels |
1 380

Installation Time |
8 Weeks
Rednut Limited
Gowran, Co. Kilkenny

System Size |
678 KWp

Number of Panels |
1,170

Installation Time |
4 weeks
Kuehne + Nagel
Swords, Co. Dublin

System Size |
600 kWp

Number of Panels |
1,600

Installation Time |
38 Days
Renishaw
Swords, Co. Dublin

System Size |
554 kWp

Number of Panels |
1,420

Installation Time |
6 Weeks
