Commercial Solar Case Studies hero

Commercial Solar Case Studies.

All the latest commercial solar projects carried out by Activ8 Solar Energies across Ireland

Commercial Solar

Case Studies.

Feel free to explore the renewable energy and solar PV projects we’ve completed for past clients, helping them save thousands on their energy bills while reducing the size of their carbon footprint, and assisting them in meeting their green targets.

Our portfolio encompasses a number of large installations across a range of sectors, including agriculture, retail, industrial and manufacturing.

Coach House

Metcalf Drive, Accrington, UK

system-size

System Size |

952 kWp

hashtag

Number of Panels |

3 022

clock-3

Installation Time |

6 Weeks

Musgrave Kilcock

Kilcock, Co. Meath

system-size

System Size |

909 kWp

hashtag

Number of Panels |

1,800

clock-3

Installation Time |

12 Weeks

The Musgrave Group, Ireland’s largest grocery and food distributor. With 222 SuperValu and over 490 Centra stores throughout Ireland, SuperValu and Centra has served the people of Ireland for over 30 years and have become well established landmarks across Irish communities. This reputation has been earned through their fresh food quality, strong value offering, consistent support of local producers and the expertise and customer service across our stores.

Board24

Ribbleton, Preston, UK

system-size

System Size |

795.8 kWp

hashtag

Number of Panels |

1 730

clock-3

Installation Time |

10 Weeks

Bespoke Solar PV system for their Preston site

Irish Dog Foods

Naas, Co. Kildare

system-size

System Size |

787 kWp

hashtag

Number of Panels |

1,368

clock-3

Installation Time |

5 Weeks

Irish Dog Foods develop and produce award winning pet food with a strong focus on innovation, produced to the highest manufacturing quality standards. With over 25 years of domestic and international experience in private label, their customers include some of the most recognisable names in retail across the globe.

Tayto Snacks

Ashbourne, Co Meath

system-size

System Size |

772 kWp

hashtag

Number of Panels |

1,734

clock-3

Installation Time |

7 weeks

Based in Ashbourne, Co Meath, Tayto’s factory comprises of almost two acres of high quality machinery, systems and processes managed by a team of seasoned professionals – all dedicated to making the best tasting snacks possible.

Bowker Motor Group

system-size

System Size |

732.06 kWp

hashtag

Number of Panels |

1 494

clock-3

Installation Time |

8 Weeks

Port of Tyne

Tyne Dock, South Shields, UK

system-size

System Size |

690 kWp

hashtag

Number of Panels |

1 380

clock-3

Installation Time |

8 Weeks

As part of their Tyne 2050 strategy, the Port has set out an ambitious target to become a net zero port by 2030.

Rednut Limited

Gowran, Co. Kilkenny

system-size

System Size |

678 KWp

hashtag

Number of Panels |

1,170

clock-3

Installation Time |

4 weeks

Rednut Limited is an Irish company involved in manufacturing prepared animal feeds, established as a joint venture by the Queally family and Connolly’s Red Mills in Kilkenny around 2000, focusing on quality pet and farm animal nutrition.

Kuehne + Nagel

Swords, Co. Dublin

system-size

System Size |

600 kWp

hashtag

Number of Panels |

1,600

clock-3

Installation Time |

38 Days

Over the last 130 years, Kuehne+Nagel has evolved from a traditional shipping company to a global logistics partner that offers highly specialised solutions for major industries worldwide. U

Renishaw

Swords, Co. Dublin

system-size

System Size |

554 kWp

hashtag

Number of Panels |

1,420

clock-3

Installation Time |

6 Weeks

Renishaw is one of the world’s leading engineering and scientific technology companies, with expertise in precision measurement and healthcare.