Low Moor, Bradford
Dent Steel partnered with Activ8 Energies UK to install a 364 kWp rooftop solar PV system, designed to reduce grid electricity consumption while delivering annual savings of £30,000 and reducing carbon emissions by 67 tonnes per year.

Manufacturing

Low Moor, Bradford

Trina 510 kWp

714

4 Weeks

364 kWp
Dent Steel partnered with Activ8 Energies UK to deliver a 364 kWp rooftop solar PV system, designed to maximise on-site renewable energy generation while accommodating the demands of a busy manufacturing environment.
The system comprises 714 Trina solar panels and is expected to generate 323,749 kWh of clean electricity annually, reducing reliance on grid electricity.
The installation is projected to deliver annual savings of £30,000 and reduce carbon emissions by 67 tonnes per year. Completed in just four weeks, the project was delivered through careful HSE planning, operational controls and close coordination with the client.

Dent Steel's 364 kWp rooftop solar PV system is expected to generate approximately 323,749 kWh of clean electricity annually, reducing reliance on grid electricity and delivering significant financial and environmental benefits.
The system is projected to deliver annual savings of £30,000 while reducing carbon emissions by 67 tonnes per year.
This system generates approximately 323,749 kWh of clean electricity every year.
By generating renewable electricity on site, Dent Steel can reduce carbon emissions by approximately 67 tonnes of CO₂ each year.
The estimated yearly output of this system is equivalent to the energy needed to power around 128 homes in the UK for a year.
This system has a carbon impact equivalent to planting around 2,045 mature trees per year.